From stuart.elson at NRCan-RNCan.gc.ca Fri Jul 22 15:28:17 2022 From: stuart.elson at NRCan-RNCan.gc.ca (Elson, Stuart) Date: Fri, 22 Jul 2022 15:28:17 +0000 Subject: [IGSSTATION-8476] STJO00CAN- Building replacement complete, external maser installed Message-ID: Author: CACS Operations Dear Colleagues, On July 21, 2022 at approximately 21:30ut STJO00CAN came back online after the building replacement was completed. A passive hydrogen maser was also installed at that time. All available data during the building replacement project will be posted to the archives. Two outages occurred while the equipment was temporarily relocated for the main building replacement: 2022-07-05 15:30ut to 2022-07-06 20:15ut 2022-07-20 18:00ut to 2022-07-21 21:30ut An update site log will be submitted to the SLM soon. Kind Regards, CACS Operations- Canadian Geodetic Survey geodetic.informationservices at nrcan.gc.ca https://webapp.csrs.nrcan.gc.ca/geod/data-donnees/cacs-scca.php -------------- next part -------------- A non-text attachment was scrubbed... Name: winmail.dat Type: application/ms-tnef Size: 15839 bytes