From igs.acc at noaa.gov Tue Aug 7 06:24:47 2012 From: igs.acc at noaa.gov (Jake Griffiths) Date: Tue, 07 Aug 2012 09:24:47 -0400 Subject: [IGSSTATION-5041] Re: FAIR radome re-installation In-Reply-To: <5010594A.8090601@unavco.org> References: <5010594A.8090601@unavco.org> Message-ID: <5021171F.7000403@noaa.gov> Dear Colleagues, As a follow-up, the NGS internal meta-data checking detected a new site log indicating that the radome JPLA was in fact restored on August 4, 2012: http://igscb.jpl.nasa.gov/igscb/station/log/fair_20120806.log FYI, jake -- Jake Griffiths, Ph.D. Chief, CORS Branch IGS Analysis Center Coordinator Spatial Reference System Division NOAA NGS Telephone: (301) 713-3205 ext.153 SSMC3, Sta. 8826 FAX: (301) 713-4324 1315 East-West Highway Cell: (240) 678-8535 Silver Spring, MD 20910 USA Email: jake.griffiths at noaa.gov __/__/__/__/__/__/__/__/__/__/__/__/__/__/__/__/__/__/__/__/__/__/__/__/ On 7/25/2012 4:38 PM, Nic Flores wrote: > Dear Colleagues, > > We have scheduled the radome re-installation at the Fairbanks, Alaska > (FAIR) station for Friday August 3rd. An updated site log will > be submitted to the IGSCB. We apologize for any inconvenience. > > Maintenance and operations of the FAIR station is a collaborative effort > supported by JPL, UNAVCO, and The NOAA/NESDIS Tracking Station, with > funding provided by NASA's Earth Surface and Interior Focus Area - > Science Mission Directorate. > > Best Regards, > Nic Flores > > > _______________________________________________ > IGSSTATION mailing list > IGSSTATION at igscb.jpl.nasa.gov > http://igscb.jpl.nasa.gov/mailman/listinfo/igsstation