From Michael.Moore at ga.gov.au Sun Dec 24 00:00:03 2006 From: Michael.Moore at ga.gov.au (Michael.Moore at ga.gov.au) Date: Sun, 24 Dec 2006 19:00:03 +1100 Subject: [IGSSTATION-1296]: MAW1: data interuption Message-ID: <8BD19F29B0E16E4F88277A997CD872C24F8BA8@mail.ga.gov.au> ****************************************************************************** IGS Station Mail 24 Dec 00:00:09 PST 2006 Message Number 1296 ****************************************************************************** Author: Michael Moore Geoscience Australia Australian Regional GPS Network Geodetic Operation *************************************************************** GPS TRACKER id: MAW1 DOMES No. 66004M001 CDP No. N/A MONUMENT NO. AUS064 LOCATION. Mawson Australian Antarctic Territory ANTARCTICA *************************************************************** ADVISORY: An upgrade of equipement and a site survey will be taking place at Mawson station over the next 3-4 days. During this time normal operations will be interuprted until the survey has been complete. An updated log sheet will be submitted once the changes have been completed. Regrads, Michael