From pascale.defraigne at oma.be Tue Jul 17 07:25:22 2001 From: pascale.defraigne at oma.be (Pascale Defraigne) Date: Tue, 17 Jul 2001 16:25:22 +0200 Subject: [IGSMAIL-3425]: BRUS - clock jump and receiver disruption Message-ID: <3B544AD2.BBC8F76E@oma.be> ****************************************************************************** IGS Electronic Mail 17 Jul 07:25:31 PDT 2001 Message Number 3425 ****************************************************************************** Author: P. Defraigne, ROB Dear colleagues, The H-maser connected to the Z12-T receiver at BRUS presented some problems during the week 2001.07.11 to 2001.07.17 A first jump was monitored as : 5.959 microsecond on doy 192, 12UT. A second jump occured on doy 197, 12UT leading to bad observations and finally a tracking interruption. The H-maser was then re-synchronized, and restarted on doy 198, 13UT. In addition we expect that there will be no data from BRUS between 24 and 31 july, because the receiver is participating to the calibration campaign organized by the BIPM in order to determine its hardware delays. We apologize for these inconveniences, P. Defraigne -- __________________________________________ Pascale DEFRAIGNE Royal Observatory of BELGIUM Avenue Circulaire, 3 B-1180 BRUSSELS BELGIUM Tel.: 32 / 2 / 373 02 60 Fax : 32 / 2 / 374 98 22 e-mail: P.Defraigne at oma.be __________________________________________