From Danny Thu Feb 1 15:07:40 1996 From: Danny (Danny) Date: Thu, 1 Feb 1996 15:07:40 PST Subject: [IGSMAIL-1199] Severe problems at KOSG Message-ID: ****************************************************************************** IGS Electronic Mail Thu Feb 1 15:07:40 PST 1996 Message Number 1199 ****************************************************************************** Author: Danny van Loon Subject: Severe problems at KOSG Friday January 26, 1996 at about 17.00 UTC the powersupply of the PC connected to the ROGUE SNR-8 GPS receiver was shortcut. This shortcut overloaded the UPS and the entire equipment (ROGUE SNR-8, Rb frequency standard and others) was switched off and some of them damaged, mostly fuses. We are now in the process of installing the new TurboRogue SNR-12 GPS receiver and trying to get the RB frequency standard under control. In the meantime the GPS-receiver is installed and is connected to an own built crystal oscillator with a rather stable frequency. We are collecting the data and checking it on the reliability. As soon as we think that the data can be released we will do it immediately. A new stationlogsheet will be submitted to the IGSCB consequently. We really regret that this happened and were never aware of the weakness that a UPS could be overloaded and could damaging other equipment. If there is similar experience at other stations pse let me know and inform me about precautions. [Mailed From: vanloon/geo at geo.tudelft.nl] [Mailed From: Robert Liu ]